Back to top

Connecting and growing our communities.

Kotare Bridge No 1 repair

Kotare Bridge No 1 FB custom size

Earthworks and the reconstruction of some parts of Kotare Bridge No 1 abutments over Mangapoike River continue this week.

The banks on both sides of the bridge scoured out over the past 12 months and QRS was reinforcing the areas when Cyclone Gabrielle hit.

The river came up over 12 metres causing major damage to the approaches and swamping a digger that had already been moved to higher ground. QRS site supervisor Paul Reedy and his construction team are working underneath the bridge to stabilise the abutments. 

Earth baskets to strengthen the area will be added and the road pavement will then be rebuilt. 

8 June 2023

Back to Previous work

Ehara taku toa i te toa takitahi, engari he toa takitini. My strength is not mine alone, it is the strength of many.

Quality Roading and Services (Wairoa) Limited - Copyright © 2024

Disclaimers and Copyright
While every endeavour has been taken by the to ensure that the information on this website is accurate and up to date, shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith. Some of the information available in this site is from the New Zealand Public domain and supplied by relevant government agencies. cannot accept any liability for its accuracy or content. Portions of the information and material on this site, including data, pages, documents, online graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced information or material is copyright to the respective provider.

© - www.qrs.co.nz / +64 6 838 9030 / office@qrs.co.nz